| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20025279 | Name of Scheme: Gangthala & Jahidpur Kalan WSS | No. of Villages: 2 | No. of Habitation Covered: 1 |
| Total Population Covered: 2709 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 17-Sep-2022 | Actual Date of Completion (Capex): 21-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.05/81.05 | Gangthala | 28.189495 | 77.775387 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 575/45 | Gangthala | 28.189495 | 77.775387 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL/12M | Gangthala | 28.189629 | 77.775329 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | .0113 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 180 | .661 | |
| 2 | HDPE | 160 | 1.442 | |
| 3 | HDPE | 140 | .406 | |
| 4 | HDPE | 110 | .1281 | |
| 5 | HDPE | 90 | 1.751 | |
| 6 | HDPE | 75 | .112 | |
| 7 | HDPE | 63 | 5.77645 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 490 |