Project Completion Certificate (Ground Water)
Scheme ID: 20025440 Name of Scheme: Uprahula-Barayal Water Supply Scheme No. of Villages: 6 No. of Habitation Covered: 9
Total Population Covered: 3980 Base Year: 2022 Intermediate Year: 2037 Design Year: 2039
Date of Completion (As per Contract): 17-Sep-2022 Actual Date of Completion (Capex): 08-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.10/66.90 Uprahula Barayal 27.3417 82.4012
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 mtr Uprahula Barayal 27.3417 82.4012
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/16 Mtr Uprahula Barayal 27.3417 82.4012
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.018
2 HDPE 160 0.107
3 HDPE 140 2.871
4 HDPE 110 3.045
5 HDPE 90 1.062
6 HDPE 75 0.734
7 HDPE 63 7.982
HSC Connection
Sno. Total Nos.
1 467
Other Details
2.50
0.00
2.92
08-May-2025
08-May-2025