Project Completion Certificate (Ground Water)
Scheme ID: 20025485 Name of Scheme: Bijaipur No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2800 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Aug-2022 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.10/172.25 Bijaipur 26.26738 79.967355
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 30.10/62 Bijaipur 26.26738 79.967355
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 172/12 Bijaipur 26.26738 79.967355
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.025 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.60 As per Site
2 HDPE 75 2.441 As per Site
3 HDPE 90 0.791 As per Site
4 HDPE 110 0.635 As per Site
5 HDPE 140 0.279 As per Site
6 HDPE 160 0.410 As per Site
HSC Connection
Sno. Total Nos.
Other Details
1.99
2.15
2.15
08-Apr-2024
01-May-2024