Project Completion Certificate (Ground Water)
Scheme ID: 20025561 Name of Scheme: VIZHAI PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3858 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 07-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 16 M / 58.56 M VIJHAI 26.618206 79.585288
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850 LPM / 51 M VIJHAI 26.618206 79.585288
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 14 M VIJHAI 26.618206 79.585288
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0124
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.9958
2 HDPE 90 3.0625
3 HDPE 110 2.158
4 HDPE 125 1.223
5 HDPE 140 1.131
6 HDPE 160 1.693
HSC Connection
Sno. Total Nos.
1 771
Other Details
3.12
0.00
3.14
06-Jun-2024
08-Jun-2024