Project Completion Certificate (Ground Water)
Scheme ID: 20025618 Name of Scheme: FATEPUR&BANSAI No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4123 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 03-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 20.69 M / 85.40 M FATEHPUR & BANSAI 26.779595 79.593121
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800 LPM / 49 M FATEHPUR & BANSAI 26.779595 79.593121
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 12 M FATEHPUR & BANSAI 26.779595 79.593121
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0185
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.314
2 HDPE 90 2.358
3 HDPE 110 0.673
4 HDPE 125 0.679
HSC Connection
Sno. Total Nos.
1 859
Other Details
2.79
0.00
2.81
02-Aug-2024
04-Aug-2024