Project Completion Certificate (Ground Water)
Scheme ID: 20026076 Name of Scheme: BASANTPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 4950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 01-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/52.80 BASANTPUR 26º 26' 36.99" N 82º 23' 57.22" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 42/44 BASANTPUR 26º 26' 36.99" N 82º 23' 57.22" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 200/14 BASANTPUR 26º 26' 36.99" N 82º 23' 57.22" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 15.264
2 HDPE Pipe PN-6: Class PE-100 75 1.840
3 HDPE Pipe PN-6: Class PE-100 90 2.182
4 HDPE Pipe PN-6: Class PE-100 110 1.337
5 HDPE Pipe PN-6: Class PE-100 140 1.105
6 HDPE Pipe PN-6: Class PE-100 160 0.486
7 HDPE Pipe PN-6: Class PE-100 180 0.089
HSC Connection
Sno. Total Nos.
1 598
Other Details
261.48
0.00
0.00
19-Oct-2025
20-Oct-2025