Project Completion Certificate (Ground Water)
Scheme ID: 20026101 Name of Scheme: Khairpara Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 2800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Sep-2023 Actual Date of Completion (Capex): 28-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200 12.20m/64m Khairpara 25.844369 82.452980
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP 590LPM/44m Khairpara 25.844369 82.452980
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/12m Khairpara 25.844984 82.446558
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0315 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.838 Yes
2 HDPE 75 4.321 Yes
3 HDPE 63 7.753 Yes
4 HDPE 110 1.618 Yes
5 HDPE 140 0.675 Yes
6 HDPE 160 0.117 Yes
7 HDPE 200 0.030 Yes
HSC Connection
Sno. Total Nos.
1 350
Other Details
2.28
2.28
1.88
28-May-2025
29-May-2025