| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026121 | Name of Scheme: BIBIPUR RANDAULI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 3120 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 29-Sep-2022 | Actual Date of Completion (Capex): 28-Sep-2022 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24/78.80 | SAUKHANA PEERPUR | 26º 27' 16.5" N | 82º 24' 56.36" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VTPump | 33/45 | SAUKHANA PEERPUR | 26º 27' 16.5" N | 82º 24' 56.36" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC- Zink Alum Tank | 150/14 | SAUKHANA PEERPUR | 26º 27' 16.5" N | 82º 24' 56.36" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 9.248 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 1.051 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.465 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.219 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.025 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 490 |