Project Completion Certificate (Ground Water)
Scheme ID: 20026128 Name of Scheme: Kutubpur Wayer Supply Scheme No. of Villages: 2 No. of Habitation Covered: 15
Total Population Covered: 3650 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 02-Sep-2023 Actual Date of Completion (Capex): 28-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200*150 30m/238m Kutubpur 25.561148 82.64197
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5HP 730LPM/43M Kutubpur 25.561148 82.64197
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/12M Kutubpur 25.561134 82.642009
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0205 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.458 Yes
2 HDPE 75 5.554 Yes
3 HDPE 63 4.524 Yes
4 HDPE 110 0.825 Yes
5 HDPE 140 1.423 Yes
6 HDPE 160 0.175 Yes
7 HDPE 200 0.044 Yes
HSC Connection
Sno. Total Nos.
1 347
Other Details
2.44
2.04
2.06
28-May-2025
28-May-2025