| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026128 | Name of Scheme: Kutubpur Wayer Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 15 |
| Total Population Covered: 3650 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 02-Sep-2023 | Actual Date of Completion (Capex): 28-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200*150 | 30m/238m | Kutubpur | 25.561148 | 82.64197 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 730LPM/43M | Kutubpur | 25.561148 | 82.64197 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/12M | Kutubpur | 25.561134 | 82.642009 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0205 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.458 | Yes |
| 2 | HDPE | 75 | 5.554 | Yes |
| 3 | HDPE | 63 | 4.524 | Yes |
| 4 | HDPE | 110 | 0.825 | Yes |
| 5 | HDPE | 140 | 1.423 | Yes |
| 6 | HDPE | 160 | 0.175 | Yes |
| 7 | HDPE | 200 | 0.044 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 347 |