Project Completion Certificate (Ground Water)
Scheme ID: 20026153 Name of Scheme: SABNA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 4620 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 20-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/71.80 SABNA 26°27' 32.29" N 82°25' 24.82" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 46.20/44 SABNA 26°27' 32.29" N 82°25' 24.82" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 225/14 SABNA 26°27' 32.29" N 82°25' 24.82" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 18.880
2 HDPE Pipe PN-6: Class PE-100 75 3.06
3 HDPE Pipe PN-6: Class PE-100 90 0.869
4 HDPE Pipe PN-6: Class PE-100 110 1.223
HSC Connection
Sno. Total Nos.
1 560
Other Details
2.93
0.00
2.87
02-Jan-2026
03-Jan-2026