Project Completion Certificate (Ground Water)
Scheme ID: 20026206 Name of Scheme: BHANDERI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2910 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 37.20 M3 / 41 M BHANDHERI 27.768211 79.722298
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 175 KL-12 M BHANDHERI 27.770074 79.720923
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 4.275
2 HDPE / 6Kg 75 0.529
3 HDPE / 6Kg 90 0.159
4 HDPE / 6Kg 110 0.355
5 HDPE / 6Kg 140 0.368
6 HDPE / 6Kg 160 0.305
HSC Connection
Sno. Total Nos.
1 483
Other Details
1.93
0.00
1.93
30-Nov-2024
06-Dec-2024