Project Completion Certificate (Ground Water)
Scheme ID: 20026301 Name of Scheme: Hinauti Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3020 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Sep-2023 Actual Date of Completion (Capex): 12-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200x150 24m/238.37m Hinauti 25.595854 82.636364
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5HP 640LPM/46M Hinauti 25.595854 82.636364
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/14m Hinauti 25.595847 82.636319
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.012 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.984 Yes
2 HDPE 75 2.850 Yes
3 HDPE 63 6.271 Yes
4 HDPE 110 0.810 Yes
5 HDPE 140 0.790 Yes
6 HDPE 160 0.274 Yes
7 HDPE 200 0.025 Yes
HSC Connection
Sno. Total Nos.
1 445
Other Details
2.21
2.21
2.02
12-Mar-2026
13-Mar-2026