| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026301 | Name of Scheme: Hinauti Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 3020 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Sep-2023 | Actual Date of Completion (Capex): 12-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200x150 | 24m/238.37m | Hinauti | 25.595854 | 82.636364 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 640LPM/46M | Hinauti | 25.595854 | 82.636364 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL/14m | Hinauti | 25.595847 | 82.636319 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.012 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.984 | Yes |
| 2 | HDPE | 75 | 2.850 | Yes |
| 3 | HDPE | 63 | 6.271 | Yes |
| 4 | HDPE | 110 | 0.810 | Yes |
| 5 | HDPE | 140 | 0.790 | Yes |
| 6 | HDPE | 160 | 0.274 | Yes |
| 7 | HDPE | 200 | 0.025 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |