Project Completion Certificate (Ground Water)
Scheme ID: 20026590 Name of Scheme: PAHLI KUTUBPUR No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1530 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Mar-2024 Actual Date of Completion (Capex): 20-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150X200MM 23.07/130.09M PARMI KUTUBPUR 25.902605 80.93574
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP 350/55M PARMI KUTUBPUR 25.902605 80.93574
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/12M PARMI KUTUBPUR 25.902598 80.935728
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 80 MM K-9 80 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 0.118
2 HDPE 125 0.122
3 HDPE 110 0.230
4 HDPE 90 0.404
5 HDPE 75 0.706
6 HDPE 63 1.152
HSC Connection
Sno. Total Nos.
1 314
Other Details
1.35
1.36
1.36
20-Sep-2023
21-Sep-2023