| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20026728 | Name of Scheme: GOPIPUR | No. of Villages: 3 | No. of Habitation Covered: 14 |
| Total Population Covered: 5288 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 29-Sep-2023 | Actual Date of Completion (Capex): 16-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X150 | 15.05 m /225.07 m | Gipipur | 25.659076 | 82.703665 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 15 HP | 800 LPM/47 M | Gipipur | 25.659076 | 82.703665 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 KL/16 M | Gipipur | 25.659076 | 82.703665 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI, K-7 | 150 | 0.084 | yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.341 | yes |
| 2 | HDPE | 75 | 3.221 | yes |
| 3 | HDPE | 63 | 7.508 | yes |
| 4 | HDPE | 110 | .729 | yes |
| 5 | HDPE | 140 | .511 | yes |
| 6 | HDPE | 160 | .588 | yes |
| 7 | HDPE | 180 | .450 | yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 542 |