Project Completion Certificate (Ground Water)
Scheme ID: 20029962 Name of Scheme: SIKANDARPUR LALMAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2649 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Feb-2024 Actual Date of Completion (Capex): 11-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 43.66 MTR / 101.75 MTR SIKANDARPUR LALMAN 29.29482 78.178783
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERCIBLE PUMP 10 HP 350 LPM / 49 MTR SIKANDARPUR LALMAN 29.29482 78.178783
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL /12 MTR SIKANDARPUR LALMAN 29.29.8539 78.142369
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE` 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-06 CLASS PE-100 125 0.329
2 HDPE PIPE PN-06 CLASS PE-100 110 4.002
3 HDPE PIPE PN-06 CLASS PE-100 90 0.066
4 HDPE PIPE PN-06 CLASS PE-100 75 0.052
5 HDPE PIPE PN-06 CLASS PE-100 63 2.439
HSC Connection
Sno. Total Nos.
1 115
Other Details
1.39
1.39
1.39
09-Jun-2024
10-Jun-2024