| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20030779 | Name of Scheme: SEUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 9 |
| Total Population Covered: 3330 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 29-Sep-2023 | Actual Date of Completion (Capex): 25-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X150 | 24 M / 164.81 M | SEUR | 25.578698 | 82.589256 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 650 LPM/43 M | SEUR | 25.578698 | 82.589256 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /14 M | SEUR | 25.578629 | 82.589501 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | MS PIPE K-7 | 100 | 0.03 | YES |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.017 | YES |
| 2 | HDPE | 160 | 0.433 | YES |
| 3 | HDPE | 140 | 0.823 | YES |
| 4 | HDPE | 110 | 1.869 | YES |
| 5 | HDPE | 63 | 8.345 | YES |
| 6 | HDPE | 75 | 4.404 | YES |
| 7 | HDPE | 90 | 1.971 | YES |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 580 |