Project Completion Certificate (Ground Water)
Scheme ID: 20030858 Name of Scheme: UNCHANI KALAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3780 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Sep-2022 Actual Date of Completion (Capex): 11-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 26.5 M/237.12 M UNCHANI KALAN 25.685071 82.629025
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 770 LPM/43M UNCHANI KALAN 25.685071 82.629025
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL /12 M UNCHANI KALAN 25.684931 82.629035
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.758 YES
2 HDPE 75 6.018 YES
3 HDPE 63 7.880 YES
4 HDPE 110 1.883 YES
5 HDPE 140 0.964 YES
6 HDPE 160 0.568 YES
7 HDPE 200 0.020 YES
HSC Connection
Sno. Total Nos.
1 489
Other Details
2.74
2.74
2.43
11-Oct-2024
12-Oct-2024