| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20033313 | Name of Scheme: Shahpur shukla gram panchayat water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2404 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2054 |
| Date of Completion (As per Contract): 26-Sep-2024 | Actual Date of Completion (Capex): 23-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24/120.84 | SHAHPUR SHUKLA | 26.542188 | 83.966753 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 520/40 | SHAHPUR SHUKLA | 26.542188 | 83.966753 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | SHAHPUR SHUKLA | 26.542188 | 83.966753 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.0248 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 5.468 | |
| 2 | HDPE PIPE | 75 | 1.849 | |
| 3 | HDPE PIPE | 90 | 0.163 | |
| 4 | HDPE PIPE | 110 | 1.432 | |
| 5 | HDPE PIPE | 140 | 0.624 | |
| 6 | HDPE PIPE | 160 | 0.061 | |
| 7 | HDPE PIPE | 180 | 0.085 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 512 |