Project Completion Certificate (Ground Water)
Scheme ID: 20033313 Name of Scheme: Shahpur shukla gram panchayat water supply scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2404 Base Year: 2023 Intermediate Year: 2038 Design Year: 2054
Date of Completion (As per Contract): 26-Sep-2024 Actual Date of Completion (Capex): 23-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/120.84 SHAHPUR SHUKLA 26.542188 83.966753
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 520/40 SHAHPUR SHUKLA 26.542188 83.966753
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 SHAHPUR SHUKLA 26.542188 83.966753
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0248
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 5.468
2 HDPE PIPE 75 1.849
3 HDPE PIPE 90 0.163
4 HDPE PIPE 110 1.432
5 HDPE PIPE 140 0.624
6 HDPE PIPE 160 0.061
7 HDPE PIPE 180 0.085
HSC Connection
Sno. Total Nos.
1 512
Other Details
1.79
1.79
1.83
08-Nov-2024
05-Feb-2025