| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20033323 | Name of Scheme: Shami patti gram panchayat water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2570 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Sep-2024 | Actual Date of Completion (Capex): 21-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.01/119.84 | SHAMIPATTI | 26.626883 | 83.838376 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 500/40 | SHAMIPATTI | 26.626883 | 83.838376 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | SHAMIPATTI | 26.626883 | 83.838376 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 4.540 | |
| 2 | HDPE PIPE | 75 | 0.180 | |
| 3 | HDPE PIPE | 90 | 0.960 | |
| 4 | HDPE PIPE | 125 | 0.385 | |
| 5 | HDPE PIPE | 160 | 0.119 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 410 |