Project Completion Certificate (Ground Water)
Scheme ID: 20035001 Name of Scheme: SABALPUR BITRA VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3214 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 35.98 / 162.27 Sabalpur 29.618108 78.237161
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 / 55 Sabalpur 29.618108 78.237161
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 / 12 Sabalpur 29.618108 78.237161
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.871
2 HDPE 75 0.269
3 HDPE 90 0.269
4 HDPE 110 0.554
5 HDPE 160 0.043
HSC Connection
Sno. Total Nos.
1 460
Other Details
2.20
0.00
2.20
10-Jul-2025
11-Jul-2025