Project Completion Certificate (Ground Water)
Scheme ID: 20035105 Name of Scheme: BHASMA WSS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3910 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 28-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.02/79.97 Bhasma 26º 17' 34.526" N 82º 41' 13.769" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 39/42 Bhasma 26º 17' 34.526" N 82º 41' 13.769" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 175/12 Bhasma 26º 17' 34.526" N 82º 41' 13.769" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.70
2 HDPE Pipe PN-6: Class PE-100 75 6.56
3 HDPE Pipe PN-6: Class PE-100 90 0.927
4 HDPE Pipe PN-6: Class PE-100 110 0.947
5 HDPE Pipe PN-6: Class PE-100 140 0.453
6 HDPE Pipe PN-6: Class PE-100 160 0.020
7 HDPE Pipe PN-6: Class PE-100 200 0.006
HSC Connection
Sno. Total Nos.
Other Details
2.11
0.00
2.11
28-Feb-2026
01-Apr-2026