Project Completion Certificate (Ground Water)
Scheme ID: 20035262 Name of Scheme: HARSAMHAR WSS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3200 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Jan-2024 Actual Date of Completion (Capex): 01-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/73.30 Harsamhar 26°30'56.42"N 82°47'32.81"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 32.4/45 Harsamhar 26°30'56.42"N 82°47'32.81"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 150/14 Harsamhar 26°30'56.42"N 82°47'32.81"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 12.05
2 HDPE Pipe PN-6: Class PE-100 75 1.201
3 HDPE Pipe PN-6: Class PE-100 90 0.231
4 HDPE Pipe PN-6: Class PE-100 110 0.352
5 HDPE Pipe PN-6: Class PE-100 125 0.484
6 HDPE Pipe PN-6: Class PE-100 40 0.362
HSC Connection
Sno. Total Nos.
1 225
Other Details
205.70
0.00
203.53
17-Mar-2026
01-Apr-2026