Project Completion Certificate (Ground Water)
Scheme ID: 20036260 Name of Scheme: SARSAI GRAMIN PEYJAL YOJNA No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 5313 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 66.30/24.20 SARSAI 26.821196 79.755479
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible pump 1100/61 SARSAI 26.821196 79.755479
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/14 SARSAI 26.821196 79.755479
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.002 Clear Water Rising Main
2 DI 150 0.0306 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.575 Distribution Network
2 HDPE 63 10.59 Distribution Network
3 HDPE 110 4.93 Distribution Network
4 HDPE 140 1.34 Distribution Network
5 HDPE 160 1.62 Distribution Network
HSC Connection
Sno. Total Nos.
1 913
Other Details
4.51
4.42
4.51
07-Jul-2024
08-Jul-2024