| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036605 | Name of Scheme: BASTA & BHAHSORA GRAMIN PEYJAL YOJNA | No. of Villages: 2 | No. of Habitation Covered: 12 |
| Total Population Covered: 7823 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 06-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 43.01/185.12 | BASTA & BHAHSORA | 26.963961 | 79.854007 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSSIBLE PUMP | 775/65 | BASTA & BHAHSORA | 26.963961 | 79.854007 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 450/18 | BASTA & BHAHSORA | 26.963961 | 79.854007 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0015 | Clear Water Rising Main |
| 2 | DI | 150 | 0.275 | Clear Water Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 6.206 | Distribution Network |
| 2 | HDPE | 63 | 11.213 | Distribution Network |
| 3 | HDPE | 110 | 3.170 | Distribution Network |
| 4 | HDPE | 140 | 1.979 | Distribution Network |
| 5 | HDPE | 160 | 2.304 | Distribution Network |
| 6 | HDPE | 180 | 0.204 | Distribution Network |
| 7 | HDPE | 200 | 1.463 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1417 |