Project Completion Certificate (Ground Water)
Scheme ID: 20036605 Name of Scheme: BASTA & BHAHSORA GRAMIN PEYJAL YOJNA No. of Villages: 2 No. of Habitation Covered: 12
Total Population Covered: 7823 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 06-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 43.01/185.12 BASTA & BHAHSORA 26.963961 79.854007
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 775/65 BASTA & BHAHSORA 26.963961 79.854007
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 450/18 BASTA & BHAHSORA 26.963961 79.854007
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0015 Clear Water Rising Main
2 DI 150 0.275 Clear Water Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 6.206 Distribution Network
2 HDPE 63 11.213 Distribution Network
3 HDPE 110 3.170 Distribution Network
4 HDPE 140 1.979 Distribution Network
5 HDPE 160 2.304 Distribution Network
6 HDPE 180 0.204 Distribution Network
7 HDPE 200 1.463 Distribution Network
HSC Connection
Sno. Total Nos.
1 1417
Other Details
7.51
7.35
7.49
08-Jul-2024
09-Jul-2024