| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20037445 | Name of Scheme: LALAVPUR GP W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 4674 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Oct-2023 | Actual Date of Completion (Capex): 13-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.00/114.34 | Lalavpur | 28.853057 | 79.149561 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC Pump | 39.60/42.00 | Lalavpur | 28.853057 | 79.149561 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zn-Alm | 200/12 | Lalavpur | 28.853148 | 79.149640 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 125 | 0.010 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.159 | |
| 2 | HDPE | 75 | 0.266 | |
| 3 | HDPE | 63 | 4.077 | |
| 4 | HDPE | 110 | 0.0086 | |
| 5 | HDPE | 125 | 0.0305 | |
| 6 | HDPE | 140 | 0.045 | |
| 7 | HDPE | 160 | 0.3875 | |
| 8 | HDPE | 180 | 0.0138 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 370 |