Project Completion Certificate (Ground Water)
Scheme ID: 20038639 Name of Scheme: Kirto Nangli Gram Panchayat Water Supply No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2539 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 04-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30.01 / 156.44 Kirto Nangli 29.422612 78.298653
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 600 / 56 Kirto Nangli 29.422612 78.298653
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 / 12 Kirto Nangli 29.422612 78.298653
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.974
2 HDPE 75 0.202
3 HDPE 90 0.177
4 HDPE 110 0.898
5 HDPE 125 0.040
6 HDPE 140 0.038
HSC Connection
Sno. Total Nos.
1 378
Other Details
2.04
0.00
2.09
04-Nov-2024
05-Nov-2025