Project Completion Certificate (Ground Water)
Scheme ID: 20038769 Name of Scheme: Navada Keso & Umarpur Khadar Gram Panchayat Water Supply No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 21-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.14/ 110.12 UMARPUR KHADAR AND NAVADA KESHO 29.699894 78.240297
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750/48 UMARPUR KHADAR AND NAVADA KESHO 29.699894 78.240297
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 12 MTR UMARPUR KHADAR AND NAVADA KESHO 29.699894 78.240297
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.15025
2 HDPE 75 0.9414
3 HDPE 90 0.7724
4 HDPE 110 0.2813
5 HDPE 125 0.1123
6 HDPE 140 0.139
7 HDPE 160 0.4491
8 HDPE 180 0.012
9 DI-K7 250 0.040
HSC Connection
Sno. Total Nos.
1 573
Other Details
2.61
0.00
2.66
21-Nov-2025
22-Nov-2025