Project Completion Certificate (Ground Water)
Scheme ID: 20039473 Name of Scheme: Badhiwala No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2529 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-May-2024 Actual Date of Completion (Capex): 02-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.05/109m Badhiwala 29.573347 77.721478
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600LPM/49M Badhiwala 29.573347 77.721478
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 175KL/12M Badhiwala 29.573347 77.721478
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.035 Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1906.80
2 HDPE 75 526.50
3 HDPE 90 269.50
4 HDPE 110 334.20
5 HDPE 160 149
6 HDPE 200 136.70
HSC Connection
Sno. Total Nos.
1 508
Other Details
1.55
0.00
1.55
02-May-2024
03-May-2024