Project Completion Certificate (Ground Water)
Scheme ID: 20040095 Name of Scheme: Tidua PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3774 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 19-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 24.10 M / 65.28 M TIDUA 26.724637 79.619747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850 LPM / 53 M TIDUA 26.724637 79.619747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 16 M TIDUA 26.724637 79.619747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.008
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.269
2 HDPE 90 1.068
3 HDPE 110 0.715
4 HDPE 125 0.613
5 HDPE 140 0.796
6 HDPE 160 1.200
7 HDPE 180 0.618
HSC Connection
Sno. Total Nos.
1 849
Other Details
3.25
0.00
3.33
02-Mar-2024
20-Apr-2024