Project Completion Certificate (Ground Water)
Scheme ID: 20042967 Name of Scheme: PIYAREPUR No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2340 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 14-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/86.8 PIYAREPUR 26º 28' 0.798" N 82º 28' 22.221" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 24/45 PIYAREPUR 26º 28' 0.798" N 82º 28' 22.221" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum 125/14 PIYAREPUR 26º 28' 0.798" N 82º 28' 22.221" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.081
2 HDPE Pipe PN-6: Class PE-100 75 1.93
3 HDPE Pipe PN-6: Class PE-100 90 0.716
4 HDPE Pipe PN-6: Class PE-100 110 0.239
5 HDPE Pipe PN-6: Class PE-100 125 0.131
6 HDPE Pipe PN-6: Class PE-100 140 0.121
HSC Connection
Sno. Total Nos.
1 425
Other Details
1.56
0.00
0.00
31-Jan-2026
01-Mar-2026