Project Completion Certificate (Ground Water)
Scheme ID: 20050145 Name of Scheme: DASTAMPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2268 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 07-Nov-2022 Actual Date of Completion (Capex): 08-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 8/66.31 DASTAMPUR 26.386956° 79.986818°
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500/68 DASTAMPUR 26.386956° 79.986818°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 DASTAMPUR 26.386956° 79.986818°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.174
2 HDPE PIPE 75 0.447
3 HDPE PIPE 90 0.350
4 HDPE PIPE 110 0.250
5 HDPE PIPE 125 0.430
6 HDPE PIPE 140 0.450
HSC Connection
Sno. Total Nos.
1 456
Other Details
1.87
0.00
2.29
14-Dec-2023
15-Dec-2023