Scheme ID: 20050571 Name of Scheme: SALAKHANA WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2024 Actual Date of Completion (Capex): 11-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 48.16 Mtr/ 72.27 M Sala Khana 28.602178 78.454255
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 26.4 cum / 46 M Sala Khana 28.602178 78.454255
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 125 KL/ 14 M Sala Khana 28.602091 78.454469
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.0702
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.709
2 HDPE Pipe PN-6: Class PE-100 75 0.207
3 HDPE Pipe PN-6: Class PE-100 90 0.177
4 HDPE Pipe PN-6: Class PE-100 110 0.940
5 HDPE Pipe PN-6: Class PE-100 140 0.137
6 HDPE Pipe PN-6: Class PE-100 160 0.098
HSC Connection
Sno. Total Nos.
1 320
Other Details
1.68
1.66
1.66
12-Dec-2025
13-Mar-2026