Project Completion Certificate (Ground Water)
Scheme ID: 20050609 Name of Scheme: GUNNAUR DAULAT KHAN WSS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2110 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2024 Actual Date of Completion (Capex): 27-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 112.58 Mtr/ 64.18 M Gunnaur Daulat Khan 28.24426 78.424425
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 26.4 cum / 46 M Gunnaur Daulat Khan 28.24426 78.424425
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zink Al. OHT 125 KL/ 14 M Gunnaur Daulat Khan 28.244397 78.42455
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.0489
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.156
2 HDPE Pipe PN-6: Class PE-100 75 1.426
3 HDPE Pipe PN-6: Class PE-100 63 3.405
4 HDPE Pipe PN-6: Class PE-100 110 0.127
5 HDPE Pipe PN-6: Class PE-100 140 0.097
6 HDPE Pipe PN-6: Class PE-100 160 1.240
HSC Connection
Sno. Total Nos.
1 290
Other Details
1.70
1.69
1.69
28-Dec-2025
28-Mar-2026