Project Completion Certificate (Ground Water)
Scheme ID: 20050909 Name of Scheme: KALAPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3904 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Dec-2023 Actual Date of Completion (Capex): 26-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 9.05m/58.1m KALAPUR 25.94239 82..63367
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15HP 817LPM/43m KALAPUR 25.94239 82..63367
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL/12m KALAPUR 25.942133 82.633687
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0205 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.4 Yes
2 HDPE 75 1.754 Yes
3 HDPE 63 4.200 Yes
4 HDPE 110 1.248 Yes
5 HDPE 140 0.449 Yes
6 HDPE 160 0.287 Yes
7 HDPE 180 0.703 Yes
HSC Connection
Sno. Total Nos.
1 484
Other Details
2.52
2.52
2.09
26-Feb-2025
26-Feb-2025