Project Completion Certificate (Ground Water)
Scheme ID: 20051475 Name of Scheme: BUMKAHA VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 9
Total Population Covered: 4319 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Dec-2023 Actual Date of Completion (Capex): 10-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 18m/81.58m BUMKAHA 26.111196 82.590399
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP 855 LPM/47M BUMKAHA 26.111196 82.590399
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL/16M BUMKAHA 26.111143 82.590403
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0138 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.271 Yes
2 HDPE 75 3.064 Yes
3 HDPE 63 8.607 Yes
4 HDPE 110 1.273 Yes
5 HDPE 140 0.241 Yes
6 HDPE 160 1.564 Yes
7 HDPE 180 0.858 Yes
8 HDPE 200 0.389 Yes
HSC Connection
Sno. Total Nos.
1 324
Other Details
3.18
3.18
2.46
10-Jul-2025
10-Jul-2025