Project Completion Certificate (Ground Water)
Scheme ID: 20053208 Name of Scheme: Pipari WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2620 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.00/78.41 PIPARI 28.040940 79.731132
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 31.32 M3 / 43 M PIPARI 28.040940 79.731132
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150 KL-12 M PIPARI 28.040985 79.730977
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 3.947
2 HDPE / 6Kg 75 0.344
3 HDPE / 6Kg 90 0.269
4 HDPE / 6Kg 110 1.298
5 HDPE / 6Kg 140 0.173
HSC Connection
Sno. Total Nos.
1 492
Other Details
1.93
0.00
1.86
30-Dec-2023
06-Dec-2024