Project Completion Certificate (Ground Water)
Scheme ID: 20055808 Name of Scheme: DULHAPUR & DEWRI WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3040 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/70.5 DEWRI, DULHAPUR 26.149601 82.255401
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 640LPM/44M DEWRI, DULHAPUR 26.149601 82.255401
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/12M DEWRI, DULHAPUR 26.149796 82.255553
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 8.773
2 HDPE-PN-6 , PE-100 75 3.915
3 HDPE-PN-6 , PE-100 90 1.295
4 HDPE-PN-6 , PE-100 110 1.804
5 HDPE-PN-6 , PE-100 140 1.200
6 HDPE-PN-6 , PE-100 160 1.572
HSC Connection
Sno. Total Nos.
1 330
Other Details
247.69
247.69
248.54
31-Mar-2025
28-Apr-2026