Project Completion Certificate (Ground Water)
Scheme ID: 20055891 Name of Scheme: SONARA Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 16
Total Population Covered: 4150 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 02-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.00/98.50 SONARA 26.339022 82.16176
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 880LPM/42M SONARA 26.339022 82.16176
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250KL/12M SONARA 26.339022 82.16176
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 16.133
2 HDPE Pipe PN-6: Class PE-100 75 2.134
3 HDPE Pipe PN-6: Class PE-100 90 2.255
4 HDPE Pipe PN-6: Class PE-100 110 1.627
5 HDPE Pipe PN-6: Class PE-100 140 0.683
6 HDPE Pipe PN-6: Class PE-100 160 0.380
7 HDPE Pipe PN-6: Class PE-100 200 0.033
HSC Connection
Sno. Total Nos.
1 750
Other Details
346.27
0.00
343.31
02-Jan-2026
02-Feb-2026