Project Completion Certificate (Ground Water)
Scheme ID: 20055904 Name of Scheme: Barru phaphund No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2020 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 20-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubwell 27.01 M / 99.5 M Barru Phaphund 26.679387 79.564473
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 39.9 (M3/Hr.) / 43 (Mtr.) Barru Phaphund 26.679387 79.564473
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 (KL) / 12 (Mtr.) Barru Phaphund 26.679275 79.564535
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.433
2 HDPE 75 0.391
3 HDPE 110 0.137
4 HDPE 140 0.048
HSC Connection
Sno. Total Nos.
1 358
Other Details
1.34
1.39
1.39
09-May-2024
10-May-2024