| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056131 | Name of Scheme: Hasanpur ahiran | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2070 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 15-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.13 Mtr./109.49 Mtr. | Hasanpur Ahiran | 26.651645* | 79.345009* |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (36.4M3/Hr.)/45Mtr. | Hasanpur Ahiran | 26.651645* | 79.345009* |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | Hasanpur Ahiran | 26.651698* | 79.345025* |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.024 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.10 | |
| 2 | HDPE | 75 | .26 | |
| 3 | HDPE | 90 | .52 | |
| 4 | HDPE | 110 | .19 | |
| 5 | HDPE | 140 | 1.08 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 370 |