| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056884 | Name of Scheme: MATIYARI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 11 |
| Total Population Covered: 2154 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Nov-2024 | Actual Date of Completion (Capex): 27-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 82.06 | Matiyari | 25.675498 | 82.828894 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP | 500 | Matiyari | 25.675498 | 82.828894 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | Matiyari | 25.675455 | 82.828684 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 100 | 0.0243 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 | 90 | 0.195 | |
| 2 | PN-6 | 75 | 3.414 | |
| 3 | PN-6 | 63 | 8.108 | |
| 4 | PN-6 | 110 | 1.606 | |
| 5 | PN-6 | 125 | 0.345 | |
| 6 | PN-6 | 160 | 0.017 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 346 |