Project Completion Certificate (Ground Water)
Scheme ID: 20056884 Name of Scheme: MATIYARI VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 11
Total Population Covered: 2154 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Nov-2024 Actual Date of Completion (Capex): 27-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 82.06 Matiyari 25.675498 82.828894
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP 500 Matiyari 25.675498 82.828894
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 Matiyari 25.675455 82.828684
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.0243
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 90 0.195
2 PN-6 75 3.414
3 PN-6 63 8.108
4 PN-6 110 1.606
5 PN-6 125 0.345
6 PN-6 160 0.017
HSC Connection
Sno. Total Nos.
1 346
Other Details
2.19
2.19
1.81
27-Feb-2025
27-Feb-2025