Project Completion Certificate (Ground Water)
Scheme ID: 20056921 Name of Scheme: ALI NAGER (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 5500 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 28-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22M/105.5M ALI NAGER 27.49012 80.33665
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 65.4M³ per Hr / 45M ALI NAGER 27.49012 80.33665
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325KL/16M ALI NAGER 27.49012 80.33665
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.052
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 5.473
2 HDPE PIPE PN:-6 75 3.175
3 HDPE PIPE PN:-6 90 2.966
4 HDPE PIPE PN:-6 110 2.773
5 HDPE PIPE PN:-6 125 .629
6 HDPE PIPE PN:-6 140 0
7 HDPE PIPE PN:-6 160 3.161
8 HDPE PIPE PN:-6 180 0
9 HDPE PIPE PN:-6 200 0
HSC Connection
Sno. Total Nos.
1 960
Other Details
3.76
0.00
3.65
27-Jun-2025
26-Sep-2025