Project Completion Certificate (Ground Water)
Scheme ID: 20057105 Name of Scheme: KOTRA JJM. No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 19-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20M/111M KOTRA 27.420599 80.372432
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 43.8M³ per Hr / 45M KOTRA 27.420599 80.372432
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/16M KOTRA 27.420599 80.372432
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 3.832
2 HDPE PIPE PN:-6 75 2.161
3 HDPE PIPE PN:-6 90 1.343
4 HDPE PIPE PN:-6 110 0.497
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 1.509
7 HDPE PIPE PN:-6 160 0.00
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.115
HSC Connection
Sno. Total Nos.
1 670
Other Details
2.50
0.00
2.44
18-Aug-2025
26-Sep-2025