Project Completion Certificate (Ground Water)
Scheme ID: 20057175 Name of Scheme: BASANTPUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2338 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jul-2024 Actual Date of Completion (Capex): 30-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW PLAIN PIPE-200MM 36M BASANTPUR 27.199625 83.412663
2 MSERW SLOTTED PIPE-150MM 15M BASANTPUR 27.199625 83.412663
3 MSERW PLAIN PIPE-150MM 69M BASANTPUR 27.199625 83.412663
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 29.99M3/37M BASANTPUR 27.199625 83.412663
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINK ALM OVER HEAD TANK 150KL/12M BASANTPUR 27.199593 83.412425
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE/DI(K-9) 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6,PE-100/HDPE 110 .375
2 PN-6,PE-100/HDPE 90 1.214
3 PN-6,PE-100/HDPE 75 1.078
4 PN-6,PE-100/HDPE 63 2.238
HSC Connection
Sno. Total Nos.
1 321
Other Details
1.60
1.60
1.60
28-Feb-2025
01-Mar-2025