| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057252 | Name of Scheme: AJORPUR AND ATRAURA VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 3305 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 23-Jan-2024 | Actual Date of Completion (Capex): 15-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 9.5m/46.82m | AJORPUR AND ATRAURA | 25.683518 | 82.877771 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5HP | 700LPM/44M | AJORPUR AND ATRAURA | 25.683518 | 82.877771 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200KL/12M | AJORPUR AND ATRAURA | 25.683546 | 82.877734 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 200 | 0.003 | Yes |
| 2 | DI K-7 | 150 | 0.01075 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.330 | Yes |
| 2 | HDPE | 75 | 2.011 | Yes |
| 3 | HDPE | 63 | 9.771 | Yes |
| 4 | HDPE | 110 | 0.749 | Yes |
| 5 | HDPE | 125 | 0.544 | Yes |
| 6 | HDPE | 160 | 1.7068 | Yes |
| 7 | HDPE | 180 | 0.186 | Yes |
| 8 | HDPE | 200 | 0.313 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 408 |