| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057280 | Name of Scheme: THOK KABOOLPUR (GOGP) JJM | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 5640 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 02-Feb-2024 | Actual Date of Completion (Capex): 02-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27M/ 114.8M | THOK KABOOLPUR (GOGP) | 27.360027 | 80.33088 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1.120 M³ per Min /45Mtr | THOK KABOOLPUR (GOGP) | 27.360027 | 80.33088 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 325KL/ 16M | THOK KABOOLPUR (GOGP) | 27.360073 | 80.330915 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 200 | 0.02533 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 4.386 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 3.322 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 3.268 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 1.432 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 2.642 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 140 | 1.194 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 160 | 1.748 | |
| 8 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.067 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 856 |