Scheme ID: 20058299 Name of Scheme: TATURA(GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 5970 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 10-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30M/112M KALA AAM 27.376811 80.338512
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 75M³ per Hr / 45M KALA AAM 27.376811 80.338512
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 375KL/16M KALA AAM 27.376811 80.338512
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 48.1
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4439.8
2 HDPE PIPE PN:-6 75 4348.9
3 HDPE PIPE PN:-6 90 3236.5
4 HDPE PIPE PN:-6 110 1488.7
5 HDPE PIPE PN:-6 125 1736.8
6 HDPE PIPE PN:-6 140 0
7 HDPE PIPE PN:-6 160 381.4
8 HDPE PIPE PN:-6 180 0
9 HDPE PIPE PN:-6 200 2219.9
HSC Connection
Sno. Total Nos.
1 1320
Other Details
4.04
0.00
3.94
09-Aug-2025
26-Sep-2025