Project Completion Certificate (Ground Water)
Scheme ID: 20058495 Name of Scheme: SONE GAON Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 28
Total Population Covered: 6710 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 09-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 30/63.3 SONGAON 26.371956 82.51145
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping25HP 1400/44 SONGAON 26.371356 26.371356
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 400/14 SONGAON 26.371356 82.511491
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 33.357
2 HDPE Pipe PN-6: Class PE-100 90 1.529
3 HDPE Pipe PN-6: Class PE-100 73 1.024
4 HDPE Pipe PN-6: Class PE-100 110 1.18
5 HDPE Pipe PN-6: Class PE-100 140 0.844
6 HDPE Pipe PN-6: Class PE-100 200 0.418
7 HDPE Pipe PN-6: Class PE-100 160 1.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 34
HSC Connection
Sno. Total Nos.
1 1057
Other Details
4.81
4.65
4.65
09-Oct-2025
12-Nov-2025