Project Completion Certificate (Ground Water)
Scheme ID: 20058869 Name of Scheme: AURANGPUR BHIKKO WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3027 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube- Well 36.08/151.63 Aurangpur Bhikkoo 29.65274 78.250932
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 650/59 Aurangpur Bhikkoo 29.65274 78.250932
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 Mtr Aurangpur Bhikkoo 29.65274 78.250932
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.5485
2 HDPE 75 0.3183
3 HDPE 90 0.9933
4 HDPE 110 0.457
5 HDPE 125 0
6 HDPE 140 0.3261
7 HDPE 160 0554
8 HDPE 180 0.054
HSC Connection
Sno. Total Nos.
1 567
Other Details
2.52
0.00
2.55
19-Nov-2025
20-Nov-2025