Project Completion Certificate (Ground Water)
Scheme ID: 20058981 Name of Scheme: ARWA GAJADHARPUR JJM No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3010 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 26-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20M/101.7M ARWA GAJADHARPUR 27.50168 80.340622
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 38.4M³ per Hr / 45M ARWA GAJADHARPUR 27.50168 80.340622
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/16MTR ARWA GAJADHARPUR 27.50168 80.340622
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 4.400
2 HDPE PIPE PN:-6 75 2.982
3 HDPE PIPE PN:-6 90 2.198
4 HDPE PIPE PN:-6 110 1.296
5 HDPE PIPE PN:-6 125 1.729
6 HDPE PIPE PN:-6 140 .024
7 HDPE PIPE PN:-6 160 .649
8 HDPE PIPE PN:-6 180 0.000
9 HDPE PIPE PN:-6 200 0.00
HSC Connection
Sno. Total Nos.
1 500
Other Details
2.58
0.00
2.52
25-Aug-2025
20-Feb-2026